ITAC Assessment: HO0064
ITAC logo
ITAC Assessment: HO0064
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Corrugated Boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 90,000
ft2
Annual Production 48,000
ton
Production Hrs. Annual 6,225
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $250,974 2,527,550
kWh
Natural Gas $94,837 24,022
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,664 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,664

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,730 $2,851 $6,730
67,995
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,824 $3,000 $1,824
18,464
kWh
-
03 2.4133: Use most efficient type of electric motors $552 $592 $552
5,569
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $357 $140 $357
3,517
kWh
-
05 2.2136: Install / repair insulation on steam lines $1,201 $317 - $1,201
-
MMBtu
TOTAL RECOMMENDED $10,664 $6,900 $9,463
95,545
kWh
$1,201
-
MMBtu
TOTAL IMPLEMENTED $10,664 $6,900 $9,463
95,545
kWh
$1,201
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs