ITAC Assessment: HO0058
ITAC logo
ITAC Assessment: HO0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Driveway and roof coatings
NAICS
n/a
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 102,000
ft2
Annual Production 2,250
Tgal
Production Hrs. Annual 2,210
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $189,984 1,473,916
kWh
Natural Gas $95,145 26,229
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,618 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,484 $5,473 $4,484
34,877
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $484 $1,645 $484
3,810
kWh
-
03 2.4133: Use most efficient type of electric motors $1,202 $2,138 $1,202
9,379
kWh
-
04 2.2511: Insulate bare equipment $372 $215 - $372
-
MMBtu
05 2.1133: Adjust burners for efficient operation $4,076 $1,600 - $4,076
-
MMBtu
TOTAL RECOMMENDED $10,618 $11,071 $6,170
48,066
kWh
$4,448
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs