| Assessment Year | 1993 |
|---|---|
| Principal Product | Ready mix concrete |
| NAICS |
n/a
|
| SIC | 3272: Concrete Products, Except Block and Brick |
| Sales Range | $5 M to 10M |
| # of Employees | 110 |
| Plant Area |
10,000
ft2
|
| Annual Production | 405,000
ton
|
| Production Hrs. Annual | 3,315
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $124,713 | 850,821 |
kWh
|
$0.15 |
| LPG | $2,215 | 184 |
MMBtu
|
$12.04 |
| Fuel Oil #2 | $27,285 | 4,200 |
MMBtu
|
$6.50 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $51,491 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,379 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,845 | $1,328 |
$1,845
12,603
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $133 | $198 |
$133
879
kWh
|
- | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $401 | $705 |
$401
2,638
kWh
|
- | - | |
| 04 | 2.2136: Install / repair insulation on steam lines | $49,112 | $180,000 |
$85,061
580,305
kWh
|
$(-23,186.0)
-
MMBtu
|
$(-12,763.0) | |
| TOTAL RECOMMENDED | $51,491 | $182,231 |
$87,440
596,425
kWh
|
$(-23,186.0)
-
MMBtu
|
$(-12,763.0) | ||
| TOTAL IMPLEMENTED | $2,379 | $2,231 |
$2,379
16,120
kWh
|
- | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs