ITAC Assessment: HO0046
ITAC logo
ITAC Assessment: HO0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Ready mix concrete
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area 10,000
ft2
Annual Production 405,000
ton
Production Hrs. Annual 3,315
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,713 850,821
kWh
LPG $2,215 184
MMBtu
Fuel Oil #2 $27,285 4,200
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,491 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,379

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,845 $1,328 $1,845
12,603
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $133 $198 $133
879
kWh
- -
03 2.4133: Use most efficient type of electric motors $401 $705 $401
2,638
kWh
- -
04 2.2136: Install / repair insulation on steam lines $49,112 $180,000 $85,061
580,305
kWh
$(-23,186.0)
-
MMBtu
$(-12,763.0)
TOTAL RECOMMENDED $51,491 $182,231 $87,440
596,425
kWh
$(-23,186.0)
-
MMBtu
$(-12,763.0)
TOTAL IMPLEMENTED $2,379 $2,231 $2,379
16,120
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs