ITAC Assessment: HO0039
ITAC logo
ITAC Assessment: HO0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Thermocouple Temperature Probes
NAICS
n/a
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 12,000
ft2
Annual Production 41,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,966 189,332
kWh
Natural Gas $4,089 662
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,758 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,561 $1,262 $2,561
18,757
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $284 $674 $284
2,052
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $53 $200 $53
293
kWh
-
04 2.2136: Install / repair insulation on steam lines $28 $99 - $28
-
MMBtu
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,224 $4,000 $1,580
13,482
kWh
$(-356.0)
-
MMBtu
06 2.7135: Install occupancy sensors $608 $400 $608
4,396
kWh
-
TOTAL RECOMMENDED $4,758 $6,635 $5,086
38,980
kWh
$(-328.0)
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs