Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Plastic Bags
NAICS
n/a
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 70,000
ft2
Annual Production 520,000,000
pieces
Production Hrs. Annual 5,060
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $261,786 2,117,526
kWh
Natural Gas $55,388 10,837
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,764 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,125 $404 n/a $6,125
49,531
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,371 $204 n/a $2,371
19,050
kWh
-
03 2.4133: Use most efficient type of electric motors $1,063 $337 n/a $1,063
8,499
kWh
-
04 2.2511: Insulate bare equipment $130 $184 n/a - $130
-
MMBtu
05 3.4115: Recover and reuse cooling water $24,843 $17,500 n/a $24,843
65,944
kWh
-
06 2.7231: Use radiant heater for spot heating $3,232 $5,000 n/a - $3,232
-
MMBtu
TOTAL RECOMMENDED $37,764 $23,629 $34,402
143,024
kWh
$3,362
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs