ITAC Assessment: HO0016
ITAC logo
ITAC Assessment: HO0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ARCHITECTURAL METAL PRODUCTS
NAICS
n/a
SIC 3446: Architectural and Ornamental Metal Work
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area
n/a
Annual Production 120
pieces
Production Hrs. Annual 2,083
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,366 302,755
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,984 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $588 $150 $647
3,517
kWh
- $(-59.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $625 $71 $625
3,517
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,428 $9,614 $4,428
24,619
kWh
- -
04 2.4133: Use most efficient type of electric motors $152 $200 $152
879
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $336 $160 $336
1,758
kWh
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,070 $1,200 - $1,870
-
MMBtu
$(-800.0)
07 2.8121: Apply for tax-free status for energy purchases $502 $200 $502
-
kWh
- -
08 2.2136: Install / repair insulation on steam lines $283 $536 - $283
-
MMBtu
-
TOTAL RECOMMENDED $7,984 $12,131 $6,690
34,290
kWh
$2,153
-
MMBtu
$(-859.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs