Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PHARMACEUTICAL PRODUCTS
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,340
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $286,916 2,278,136
kWh
Fuel Oil #2 $53,560 7,960
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $178,215 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $178,215

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7123: Keep lamps and reflectors clean $20,537 $17,985 $20,537
162,954
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,403 $7,562 $4,403
36,049
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,591 $35,640 $6,591
52,462
kWh
- -
04 2.4133: Use most efficient type of electric motors $462 $259 $462
3,810
kWh
- -
05 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $144,397 - $136,625
1,377,491
kWh
$31,631
-
MMBtu
$(-23,859.0)
06 2.2511: Insulate bare equipment $138 $173 - $138
-
MMBtu
-
07 2.1243: Use heat from boiler blowdown to preheat boiler feed water $1,687 $1,400 - $1,687
-
MMBtu
-
TOTAL RECOMMENDED $178,215 $63,019 $168,618
1,632,766
kWh
$33,456
-
MMBtu
$(-23,859.0)
TOTAL IMPLEMENTED $178,215 $63,019 $168,618
1,632,766
kWh
$33,456
-
MMBtu
$(-23,859.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs