| Assessment Year | 1991 |
|---|---|
| Principal Product | PHARMACEUTICAL PRODUCTS |
| NAICS |
n/a
|
| SIC | 2834: Pharmaceutical Preparations |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,340
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $286,916 | 2,278,136 |
kWh
|
$0.13 |
| Fuel Oil #2 | $53,560 | 7,960 |
MMBtu
|
$6.73 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $178,215 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $178,215 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7123: Keep lamps and reflectors clean | $20,537 | $17,985 |
$20,537
162,954
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,403 | $7,562 |
$4,403
36,049
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,591 | $35,640 |
$6,591
52,462
kWh
|
- | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $462 | $259 |
$462
3,810
kWh
|
- | - | |
| 05 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $144,397 | - |
$136,625
1,377,491
kWh
|
$31,631
-
MMBtu
|
$(-23,859.0) | |
| 06 | 2.2511: Insulate bare equipment | $138 | $173 | - |
$138
-
MMBtu
|
- | |
| 07 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $1,687 | $1,400 | - |
$1,687
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $178,215 | $63,019 |
$168,618
1,632,766
kWh
|
$33,456
-
MMBtu
|
$(-23,859.0) | ||
| TOTAL IMPLEMENTED | $178,215 | $63,019 |
$168,618
1,632,766
kWh
|
$33,456
-
MMBtu
|
$(-23,859.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs