ITAC Assessment: HO0002
ITAC logo
ITAC Assessment: HO0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product CORRUGATED BOXES
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area
n/a
Annual Production 500
pieces
Production Hrs. Annual 4,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $287,770 2,463,951
kWh
Natural Gas $135,510 35,382
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,113 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,113

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $112 $652 $112
879
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $4,633 $500 $4,633
39,859
kWh
-
03 2.4133: Use most efficient type of electric motors $1,781 $829 $1,781
15,240
kWh
-
04 2.2136: Install / repair insulation on steam lines $837 $553 - $837
-
MMBtu
05 2.2135: Repair and eliminate steam leaks $5,750 $150 - $5,750
-
MMBtu
TOTAL RECOMMENDED $13,113 $2,684 $6,526
55,978
kWh
$6,587
-
MMBtu
TOTAL IMPLEMENTED $13,113 $2,684 $6,526
55,978
kWh
$6,587
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs