ITAC Assessment: GT1000
ITAC logo
ITAC Assessment: GT1000
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Fuel, Vegetable + Tall Oil, Caustic Acid
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 275
Plant Area 300,000
ft2
Annual Production 221,306
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $817,823 6,680,489
kWh
Electricity Fees $67,427 -
Natural Gas $338,953 69,065
MMBtu
TOTAL YEARLY COSTS $1,224,203
RECOMMENDED SAVINGS* $386,687 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $55,610 $400 - $55,610 - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,312 $200 $3,312
27,148
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,557 $1,850 $5,457
44,730
kWh
- - $(-2,900.0) -
04 4.212: Adopt in-house material generation $88,408 $75,000 $(-8,971.7)
(-73,539)
kWh
- - - $97,380
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,128 $6,214 $5,128
42,035
kWh
- - - -
06 2.2136: Install / repair insulation on steam lines $1,088 $2,460 - - $1,088
-
MMBtu
- -
07 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $228,801 $603,750 $267,180
2,190,000
kWh
- $(-38,379.0)
-
MMBtu
- -
08 2.3212: Optimize plant power factor $1,783 $8,009 - $1,783 - - -
TOTAL RECOMMENDED $386,687 $697,883 $272,105
2,230,374
kWh
$57,393 $(-37,291.0)
-
MMBtu
$(-2,900.0) $97,380
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs