ITAC Assessment: GT0997
ITAC logo
ITAC Assessment: GT0997
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Automotive Parts
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 180,000
ft2
Annual Production 32,000
units
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $389,591 7,688,312
kWh
Natural Gas $7,929 916
MMBtu
Other Gas $554 1
MMBtu
TOTAL YEARLY COSTS $398,074
RECOMMENDED SAVINGS* $56,943 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,584 $600 $1,584
31,063
kWh
- - -
02 2.8121: Apply for tax-free status for energy purchases $470 $200 - $470
-
MMBtu
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,824 $1,850 $4,724
92,624
kWh
- $(-2,900.0) -
04 4.212: Adopt in-house material generation $53,017 $75,000 $(-4,363.1)
(-85,552)
kWh
- - $57,380
05 2.6211: Conserve energy by efficient use of vending machines $48 $90 $48
940
kWh
- - -
TOTAL RECOMMENDED $56,943 $77,740 $1,993
39,075
kWh
$470
-
MMBtu
$(-2,900.0) $57,380
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs