ITAC Assessment: GT0992
ITAC logo
ITAC Assessment: GT0992
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Moving Products for HVAC Industry
NAICS 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 56,000
ft2
Annual Production 444,130
units
Production Hrs. Annual 4,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,519 1,019,320
kWh
Natural Gas $7,084 456
MMBtu
Other Gas $5,485 1
MMBtu
TOTAL YEARLY COSTS $157,088
RECOMMENDED SAVINGS* $144,854 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $2,701 $100 - $2,701
-
MMBtu
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,215 $1,850 $17,115
120,920
kWh
- $(-2,900.0) - -
03 2.6211: Conserve energy by efficient use of vending machines $328 $135 $328
2,311
kWh
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $951 $400 $951
6,695
kWh
- - - -
05 2.8123: Pay utility bills on time $95 $50 - $95
-
MMBtu
- - -
06 2.8121: Apply for tax-free status for energy purchases $350 $200 - $350
-
MMBtu
- - -
07 2.9114: Use solar heat to make electricty $53,987 $203,336 $53,987
380,784
kWh
- - - -
08 2.6212: Turn off equipment during breaks, reduce operating time $271 $1,039 $271
1,911
kWh
- - - -
09 2.7232: Replace existing hvac unit with high efficiency model $58,314 $193,000 $28,314
199,396
kWh
- - $10,000 $20,000
10 2.2622: Replace existing chiller with high efficiency model $13,642 $39,500 $7,642
53,820
kWh
- - $6,000 -
TOTAL RECOMMENDED $144,854 $439,610 $108,608
765,837
kWh
$3,146
-
MMBtu
$(-2,900.0) $16,000 $20,000
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs