Assessment Year | 2025 |
---|---|
Principal Product | HDPE Sheets |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 205 |
Plant Area |
367,413
ft2
|
Annual Production | 25,026,269
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $611,197 | 13,439,164 |
kWh
|
$0.045 |
Electricity Fees | $2,088 | - |
|
- |
Natural Gas | $762 | 20 |
MMBtu
|
$38.10 |
Other Gas | $528 | 1 |
MMBtu
|
$528.00 |
TOTAL YEARLY COSTS | $614,575 | |||
RECOMMENDED SAVINGS* | $228,219 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Other Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,523 | $800 |
$7,523
167,169
kWh
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,375 | $1,850 |
$6,275
139,445
kWh
|
- | - | $(-2,900.0) | |
03 | 2.8114: Change rate schedules or other changes in utility service | $313 | $200 | - | - |
$313
-
MMBtu
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,284 | $19,750 |
$8,284
184,095
kWh
|
- | - | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $1,140 | $3,000 |
$1,140
25,344
kWh
|
- | - | - | |
06 | 2.3212: Optimize plant power factor | $2,014 | $8,907 | - | $2,014 | - | - | |
07 | 2.9114: Use solar heat to make electricty | $205,570 | $6,145,720 |
$205,570
4,520,125
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $228,219 | $6,180,227 |
$228,792
5,036,178
kWh
|
$2,014 |
$313
-
MMBtu
|
$(-2,900.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Other Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs