| Assessment Year | 2024 |
|---|---|
| Principal Product | Bathroom Partitions and Lockers |
| NAICS | 337215: Showcase, Partition, Shelving, and Locker Manufacturing |
| SIC | 2426: Hardwood Dimension and Flooring Mills |
| Sales Range | $10 M to 50M |
| # of Employees | 170 |
| Plant Area |
150,265
ft2
|
| Annual Production | 50,000
units
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $131,284 | 2,076,847 |
kWh
|
$0.063 |
| Natural Gas | $12,748 | 1,106 |
MMBtu
|
$11.53 |
| TOTAL YEARLY COSTS | $144,032 | |||
| RECOMMENDED SAVINGS* | $75,197 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,281 | $1,850 |
$12,181
193,346
kWh
|
$(-2,900.0) | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $875 | $400 |
$875
13,883
kWh
|
- | |
| 03 | 2.4239: Eliminate or reduce compressed air usage | $7,669 | $3,750 |
$7,669
121,723
kWh
|
- | |
| 04 | 2.7224: Reduce space conditioning during non-working hours | $1,676 | $1,650 |
$1,676
26,599
kWh
|
- | |
| 05 | 2.6211: Conserve energy by efficient use of vending machines | $219 | $225 |
$219
3,472
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,806 | $6,230 |
$2,806
44,553
kWh
|
- | |
| 07 | 2.6218: Turn off equipment when not in use | $775 | $1,950 |
$775
12,303
kWh
|
- | |
| 08 | 2.7135: Install occupancy sensors | $2,912 | $7,675 |
$2,912
46,224
kWh
|
- | |
| 09 | 2.9114: Use solar heat to make electricty | $48,984 | $1,053,552 |
$48,984
774,909
kWh
|
- | |
| TOTAL RECOMMENDED | $75,197 | $1,077,282 |
$78,097
1,237,012
kWh
|
$(-2,900.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs