ITAC Assessment: GT0972
ITAC logo
ITAC Assessment: GT0972
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Refrigerators/coolers
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 154,000
ft2
Annual Production 1,825
units
Production Hrs. Annual 2,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $430,241 3,833,800
kWh
Natural Gas $37,187 1,252
MMBtu
TOTAL YEARLY COSTS $467,428
RECOMMENDED SAVINGS* $134,982 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,861

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,131 $1,850 $20,031
178,845
kWh
- $(-2,900.0)
02 2.4239: Eliminate or reduce compressed air usage $17,324 $2,600 $17,324
154,677
kWh
- -
03 2.8121: Apply for tax-free status for energy purchases $1,730 $400 - $1,730 -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,356 $8,492 $4,356
38,889
kWh
- -
05 2.9114: Use solar heat to make electricty $94,441 $1,518,653 $94,441
841,548
kWh
- -
TOTAL RECOMMENDED $134,982 $1,531,995 $136,152
1,213,959
kWh
$1,730 $(-2,900.0)
TOTAL IMPLEMENTED $18,861 $2,250 $20,031
178,845
kWh
$1,730 $(-2,900.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs