ITAC Assessment: GT0964
ITAC logo
ITAC Assessment: GT0964
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Fresh Loaf Breads and Buns
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 225
Plant Area 164,000
ft2
Annual Production 562,441,165
lb
Production Hrs. Annual 7,280
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $761,691 9,050,134
kWh
Natural Gas $476,328 64,712
MMBtu
TOTAL YEARLY COSTS $1,238,019
RECOMMENDED SAVINGS* $264,618 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $96,955

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $78,169 $1,850 $81,069
965,110
kWh
- - $(-2,900.0) -
02 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $142,026 $175,000 $61,152
728,000
kWh
- $(-19,125.9)
-
MMBtu
- $100,000
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,849 $36,015 $23,849
283,920
kWh
- - - -
04 2.7232: Replace existing hvac unit with high efficiency model $18,786 $50,570 $10,786
128,400
kWh
- - $8,000 -
05 2.3212: Optimize plant power factor $1,788 $8,500 - $1,788 - - -
TOTAL RECOMMENDED $264,618 $271,935 $176,856
2,105,430
kWh
$1,788 $(-19,125.9)
-
MMBtu
$5,100 $100,000
TOTAL IMPLEMENTED $96,955 $52,420 $91,855
1,093,510
kWh
- - $5,100 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs