ITAC Assessment: GT0961
ITAC logo
ITAC Assessment: GT0961
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Filter Media and Non-Woven Fibers
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 80,000
ft2
Annual Production 10,500,000
lb
Production Hrs. Annual 5,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,147,566 37,334,068
kWh
Natural Gas $749,295 126,178
MMBtu
TOTAL YEARLY COSTS $3,896,861
RECOMMENDED SAVINGS* $929,947 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $79,612

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $58,279 $1,850 $61,179
728,327
kWh
$(-2,900.0)
02 2.4231: Reduce the pressure of compressed air to the minimum required $8,116 $800 $8,116
96,621
kWh
-
03 2.7224: Reduce space conditioning during non-working hours $1,851 $900 $1,851
22,035
kWh
-
04 2.7135: Install occupancy sensors $4,776 $4,480 $4,776
56,855
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,590 $25,886 $6,590
78,463
kWh
-
06 2.9114: Use solar heat to make electricty $850,335 $9,659,438 $850,335
10,086,038
kWh
-
TOTAL RECOMMENDED $929,947 $9,693,354 $932,847
11,068,339
kWh
$(-2,900.0)
TOTAL IMPLEMENTED $79,612 $33,916 $82,512
982,301
kWh
$(-2,900.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs