Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product manufactured automotive parts
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 50,590
ft2
Annual Production 598,350
units
Production Hrs. Annual 6,240
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,810 1,463,004
kWh
Natural Gas $3,120 312
MMBtu
TOTAL YEARLY COSTS $108,930
RECOMMENDED SAVINGS* $53,037 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,711

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.6218: Turn off equipment when not in use $9,326 $300 $9,326
129,521
kWh
- -
02 2.7224: Reduce space conditioning during non-working hours $3,116 $451 $1,396
19,383
kWh
$1,721
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,972 $1,050 $7,872
109,340
kWh
- $(-2,900.0)
04 2.7135: Install occupancy sensors $826 $625 $826
11,474
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,593 $3,220 $3,593
49,908
kWh
- -
06 2.9114: Use solar heat to make electricty $31,203 $419,703 $31,203
431,429
kWh
- -
TOTAL RECOMMENDED $53,037 $425,349 $54,216
751,055
kWh
$1,721
-
MMBtu
$(-2,900.0)
TOTAL IMPLEMENTED $43,711 $425,049 $44,891
621,534
kWh
$1,721
-
MMBtu
$(-2,900.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs