ITAC Assessment: GT0951
ITAC logo
ITAC Assessment: GT0951
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Aluminum Architectural Products
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $100
M
to 500
M
# of Employees 427
Plant Area 1,200,000
ft2
Annual Production 13,229
ton
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,635,936 35,364,914
kWh
Natural Gas $785,473 162,298
MMBtu
LPG $46,484 4,569
MMBtu
TOTAL YEARLY COSTS $3,467,893
RECOMMENDED SAVINGS* $515,260 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $265,804

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $79,957 $675 $79,957
1,072,735
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $126,097 $4,500 $126,097
1,726,128
kWh
- -
03 2.2625: Chill water to the highest temperature possible $18,092 $2,000 $18,092
242,842
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,307 $2,255 $2,307
30,972
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $54,280 $66,564 $54,280
728,592
kWh
- -
06 2.7135: Install occupancy sensors $21,155 $29,319 $21,155
283,960
kWh
- -
07 2.2437: Recover waste heat from equipment $3,162 $4,561 - - $3,162
-
MMBtu
08 2.3212: Optimize plant power factor $9,097 $34,730 - $9,097 -
09 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $201,113 $1,989,215 $336,064
6,223,400
kWh
- $(-134,951.0)
-
MMBtu
TOTAL RECOMMENDED $515,260 $2,133,820 $637,953
10,308,629
kWh
$9,097 $(-131,789.0)
-
MMBtu
TOTAL IMPLEMENTED $265,804 $78,556 $262,642
3,558,427
kWh
- $3,162
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs