ITAC Assessment: GT0947
ITAC logo
ITAC Assessment: GT0947
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product aviation grade metal tubing
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 71
Plant Area 50,000
ft2
Annual Production 72,774
units
Production Hrs. Annual 4,250
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,996 940,200
kWh
Electricity Demand $1,027 197
kW-mo/yr
Natural Gas $8,458 610
MMBtu
TOTAL YEARLY COSTS $111,481
RECOMMENDED SAVINGS* $16,541 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,095

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,436 $325 $2,436
22,522
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $606 $250 $606
5,610
kWh
- -
03 2.8121: Apply for tax-free status for energy purchases $1,554 $800 - - $1,554
04 2.2511: Insulate bare equipment $1,921 $2,060 $1,921
17,781
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,659 $4,515 $2,340
21,675
kWh
$319 -
06 2.9114: Use solar heat to make electricty $7,365 $52,257 $7,365
67,891
kWh
- -
TOTAL RECOMMENDED $16,541 $60,207 $14,668
135,479
kWh
$319 $1,554
TOTAL IMPLEMENTED $5,095 $4,840 $4,776
44,197
kWh
$319 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs