Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Custom Meat Products
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $500
k
to 1
M
# of Employees 90
Plant Area 80,000
ft2
Annual Production 21,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $292,365 3,002,400
kWh
Natural Gas $3,626 1,070
MMBtu
TOTAL YEARLY COSTS $295,991
RECOMMENDED SAVINGS* $40,088 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,370

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.7261: Install timers and/or thermostats $3,005 $563 $1,853
19,102
kWh
$1,152
-
MMBtu
-
02 2.7135: Install occupancy sensors $4,323 $2,678 $4,323
44,572
kWh
- -
03 2.6218: Turn off equipment when not in use $490 $350 $490
5,055
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,306 $3,500 $6,806
70,168
kWh
- $(-2,500.0)
05 2.2511: Insulate bare equipment $736 $1,938 - $736
-
MMBtu
-
06 2.9114: Use solar heat to make electricty $27,227 $225,984 $27,227
279,607
kWh
- -
TOTAL RECOMMENDED $40,088 $235,013 $40,700
418,504
kWh
$1,888
-
MMBtu
$(-2,500.0)
TOTAL IMPLEMENTED $12,370 $8,679 $12,983
133,842
kWh
$1,888
-
MMBtu
$(-2,500.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs