ITAC Assessment: GT0935
ITAC logo
ITAC Assessment: GT0935
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Boats
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 130,000
ft2
Annual Production 350
units
Production Hrs. Annual 5,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,289 1,435,158
kWh
Natural Gas $42,707 4,120
MMBtu
TOTAL YEARLY COSTS $173,996
RECOMMENDED SAVINGS* $16,769 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $154

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,640 $15,569 $9,640
124,652
kWh
-
02 2.4133: Use most efficient type of electric motors $154 $260 $154
1,691
kWh
-
03 2.3212: Optimize plant power factor $396 $1,444 - $396
04 2.9114: Use solar heat to make electricty $6,579 $75,597 $6,579
71,922
kWh
-
TOTAL RECOMMENDED $16,769 $92,870 $16,373
198,265
kWh
$396
TOTAL IMPLEMENTED $154 $260 $154
1,691
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs