ITAC Assessment: GT0933
ITAC logo
ITAC Assessment: GT0933
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Fiber and Yarn Extrusion
NAICS 325220: Artificial and Synthetic Fibers and Filaments Manufacturing
SIC 2273: Carpets and Rugs
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 160,000
ft2
Annual Production 38,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,464,557 23,468,029
kWh
Natural Gas $34,998 3,302
MMBtu
TOTAL YEARLY COSTS $1,499,555
RECOMMENDED SAVINGS* $148,039 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,273

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7272: Install heat pipes / raise cooling setpoint $10,455 $250 $10,455
174,251
kWh
02 2.7496: Install partitions to reduce size of conditioned space $23,854 $13,713 $23,854
397,565
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $199 $213 $199
3,320
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $32,851 $41,392 $32,851
547,517
kWh
05 2.2511: Insulate bare equipment $4,386 $6,741 $4,386
73,101
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,768 $9,616 $4,768
79,471
kWh
07 2.9114: Use solar heat to make electricty $71,526 $507,835 $71,526
1,146,126
kWh
TOTAL RECOMMENDED $148,039 $579,761 $148,039
2,421,352
kWh
TOTAL IMPLEMENTED $48,273 $51,472 $48,273
804,559
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs