ITAC Assessment: GT0917
ITAC logo
ITAC Assessment: GT0917
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Exterior Doors
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $50
M
to 100
M
# of Employees 240
Plant Area 284,000
ft2
Annual Production 416,292
units
Production Hrs. Annual 3,120
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $280,085 2,448,040
kWh
Natural Gas $18,993 1,333
MMBtu
TOTAL YEARLY COSTS $299,078
RECOMMENDED SAVINGS* $76,133 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,834

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6218: Turn off equipment when not in use $20,126 $10,000 $20,126
182,965
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,834 $10,400 $16,834
153,037
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $22,029 $18,819 $22,029
192,238
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $311 $912 $311
2,832
kWh
05 2.9114: Use solar heat to make electricty $16,833 $137,000 $16,833
147,110
kWh
TOTAL RECOMMENDED $76,133 $177,131 $76,133
678,182
kWh
TOTAL IMPLEMENTED $16,834 $10,400 $16,834
153,037
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs