| Assessment Year | 2018 |
|---|---|
| Principal Product | Wood Furniture |
| NAICS | 337211: Wood Office Furniture Manufacturing |
| SIC | 2521: Wood Office Furniture |
| Sales Range | $50 M to 100M |
| # of Employees | 280 |
| Plant Area |
180,000
ft2
|
| Annual Production | 77,497
units
|
| Production Hrs. Annual | 3,700
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $704,478 | 7,875,240 |
kWh
|
$0.089 | |
| Natural Gas | $90,610 | 8,250 |
MMBtu
|
$10.98 | |
| Waste Disposal Costs | |||||
| Water Usage | $16,593 | 1,667 |
Tgal
|
$9.95 | |
| TOTAL YEARLY COSTS | $811,681 | ||||
| RECOMMENDED SAVINGS* | $309,165 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $15,944 | $624 |
$15,944
177,154
kWh
|
- | |
| 02 | 2.7135: Install occupancy sensors | $29,561 | $5,341 |
$29,561
328,458
kWh
|
- | |
| 03 | 2.4239: Eliminate or reduce compressed air usage | $41,820 | $8,622 |
$41,820
464,668
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $59,508 | $93,857 |
$59,508
668,633
kWh
|
- | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $43,257 | $68,584 |
$35,264
391,820
kWh
|
$7,993
-
MMBtu
|
|
| 06 | 2.7241: Install outside air damper / economizer on hvac unit | $42,029 | $79,672 |
$19,527
216,911
kWh
|
$22,502
-
MMBtu
|
|
| 07 | 2.9113: Use solar heat for heat | $77,046 | $500,799 |
$77,046
861,284
kWh
|
- | |
| TOTAL RECOMMENDED | $309,165 | $757,499 |
$278,670
3,108,928
kWh
|
$30,495
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs