ITAC Assessment: GT0912
ITAC logo
ITAC Assessment: GT0912
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Rotational molded plastics
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 136,000
ft2
Annual Production 162,675
units
Production Hrs. Annual 6,432
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,203 1,654,800
kWh
Natural Gas $250,475 30,769
MMBtu
Waste Disposal Costs
Water Usage $751 141
Tgal
TOTAL YEARLY COSTS $421,429
RECOMMENDED SAVINGS* $69,503 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,610

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,273 $150 $9,273
90,203
kWh
- - -
02 4.513: Re-arrange equipment layout to reduce labor costs $8,530 $142 - - $8,530 -
03 2.2511: Insulate bare equipment $39,033 $804 - $39,033
-
MMBtu
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,178 $1,386 $2,178
21,352
kWh
- - -
05 2.8112: Combine utility meters $1,715 $2,614 - - - $1,715
06 2.7142: Utilize higher efficiency lamps and/or ballasts $8,774 $17,795 $8,774
85,304
kWh
- - -
TOTAL RECOMMENDED $69,503 $22,891 $20,225
196,859
kWh
$39,033
-
MMBtu
$8,530 $1,715
TOTAL IMPLEMENTED $65,610 $18,891 $18,047
175,507
kWh
$39,033
-
MMBtu
$8,530 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs