Assessment Year | 2018 |
---|---|
Principal Product | Rotational molded plastics |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
136,000
ft2
|
Annual Production | 162,675
units
|
Production Hrs. Annual | 6,432
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $170,203 | 1,654,800 |
kWh
|
$0.10 | |
Natural Gas | $250,475 | 30,769 |
MMBtu
|
$8.14 | |
Waste Disposal Costs | |||||
Water Usage | $751 | 141 |
Tgal
|
$5.32 | |
TOTAL YEARLY COSTS | $421,429 | ||||
RECOMMENDED SAVINGS* | $69,503 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $65,610 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,273 | $150 |
$9,273
90,203
kWh
|
- | - | - | |
02 | 4.513: Re-arrange equipment layout to reduce labor costs | $8,530 | $142 | - | - | $8,530 | - | |
03 | 2.2511: Insulate bare equipment | $39,033 | $804 | - |
$39,033
-
MMBtu
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,178 | $1,386 |
$2,178
21,352
kWh
|
- | - | - | |
05 | 2.8112: Combine utility meters | $1,715 | $2,614 | - | - | - | $1,715 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,774 | $17,795 |
$8,774
85,304
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $69,503 | $22,891 |
$20,225
196,859
kWh
|
$39,033
-
MMBtu
|
$8,530 | $1,715 | ||
TOTAL IMPLEMENTED | $65,610 | $18,891 |
$18,047
175,507
kWh
|
$39,033
-
MMBtu
|
$8,530 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs