ITAC Assessment: GT0901
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Aircraft part repair
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 50,000
ft2
Annual Production 6,000
units
Production Hrs. Annual 4,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $195,319 1,713,285
kWh
Natural Gas $1,501 166
MMBtu
TOTAL YEARLY COSTS $196,820
RECOMMENDED SAVINGS* $171,036 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $109,444

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6218: Turn off equipment when not in use $89,452 $5,000 $89,452
813,918
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $19,992 $10,805 $19,992
173,089
kWh
03 2.2437: Recover waste heat from equipment $1,259 $2,654 $1,259
11,295
kWh
04 2.7233: Use properly designed and sized hvac equipment $8,249 $18,040 $8,249
74,994
kWh
05 2.9113: Use solar heat for heat $52,084 $187,502 $52,084
456,889
kWh
TOTAL RECOMMENDED $171,036 $224,001 $171,036
1,530,185
kWh
TOTAL IMPLEMENTED $109,444 $15,805 $109,444
987,007
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs