ITAC Assessment: GT0900
ITAC logo
ITAC Assessment: GT0900
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Cotton yarn
NAICS 313110: Fiber, Yarn, and Thread Mills
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 104
Plant Area 254,000
ft2
Annual Production 75,000,000
lb
Production Hrs. Annual 8,424
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,642,319 54,001,574
kWh
TOTAL YEARLY COSTS $1,642,319
RECOMMENDED SAVINGS* $105,356 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,361

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7221: Lower temperature during the winter season and vice-versa $2,820 $250 $2,820
94,000
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,671 $250 $2,671
89,042
kWh
03 2.2625: Chill water to the highest temperature possible $1,890 $180 $1,890
63,011
kWh
04 2.7211: Clean and maintain refrigerant condensers and towers $42,468 $8,000 $42,468
1,682,273
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $38,980 $127,113 $38,980
1,299,326
kWh
06 2.2511: Insulate bare equipment $16,527 $106,785 $16,527
550,930
kWh
TOTAL RECOMMENDED $105,356 $242,578 $105,356
3,778,582
kWh
TOTAL IMPLEMENTED $46,361 $127,793 $46,361
1,545,379
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs