ITAC Assessment: GT0896
ITAC logo
ITAC Assessment: GT0896
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Pharmaceuticals
NAICS 325414: Biological Product (except Diagnostic) Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 200,000
ft2
Annual Production 7,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $862,135 10,998,466
kWh
Natural Gas $126,262 32,205
MMBtu
Waste Disposal Costs
Water Usage $2,726 180
Tgal
TOTAL YEARLY COSTS $991,123
RECOMMENDED SAVINGS* $127,829 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,871

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $15,852 $90,000 $15,852
203,225
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,487 $3,000 - $1,487
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $16,122 $35,484 $16,122
206,694
kWh
-
04 2.7135: Install occupancy sensors $438 $300 $438
5,619
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,749 $6,180 $2,749
35,240
kWh
-
06 2.9114: Use solar heat to make electricty $91,181 $355,605 $91,181
1,168,984
kWh
-
TOTAL RECOMMENDED $127,829 $490,569 $126,342
1,619,762
kWh
$1,487
-
MMBtu
TOTAL IMPLEMENTED $18,871 $41,664 $18,871
241,934
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs