Assessment Year | 2012 |
---|---|
Principal Product | Doors, Window, and Other |
NAICS | 331318: Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3354: Aluminum Extruded Products |
Sales Range | $100 M to 500M |
# of Employees | 345 |
Plant Area |
900,000
ft2
|
Annual Production | 10,000
ton
|
Production Hrs. Annual | 4,500
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,448,947 | 25,939,241 |
kWh
|
$0.056 |
Electricity Demand | $593,404 | 52,017 |
kW-mo/yr
|
$11.41 |
Electricity Fees | $450,705 | - |
|
- |
Natural Gas | $776,819 | 104,582 |
MMBtu
|
$7.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $96,889 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4314: Use synthetic lubricant | $32,596 | - |
$22,535
441,000
kWh
|
$10,061
-
kW-mo/yr
|
- | - | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $100 | - |
$100
1,966
kWh
|
- | - | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $2,563 | $2,250 |
$1,962
30,510
kWh
|
$601
-
kW-mo/yr
|
- | - | |
04 | 2.2531: Re-size charging openings or add movable cover or door | $2,915 | $1,680 | - | - |
$2,915
-
MMBtu
|
- | |
05 | 2.2437: Recover waste heat from equipment | $17,200 | $15,000 | - | - |
$17,200
-
MMBtu
|
- | |
06 | 2.7135: Install occupancy sensors | $12,520 | $18,060 |
$12,520
245,029
kWh
|
- | - | - | |
07 | 2.8114: Change rate schedules or other changes in utility service | $24,690 | $109,600 | - | - | - | $24,690 | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,305 | $18,600 |
$2,721
48,600
kWh
|
$1,584
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $96,889 | $165,190 |
$39,838
767,105
kWh
|
$12,246
-
kW-mo/yr
|
$20,115
-
MMBtu
|
$24,690 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs