ITAC Assessment: GT0879
ITAC logo
ITAC Assessment: GT0879
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Nickel Cadmium Batteries
NAICS 335911: Storage Battery Manufacturing
SIC 3691: Storage Batteries
Sales Range $50
M
to 100
M
# of Employees 220
Plant Area 206,000
ft2
Annual Production 11,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $786,132 12,355,038
kWh
Electricity Fees $93,641 -
Natural Gas $217,713 65,741
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $413,588 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,254

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,235 $1 $6,235
84,510
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $15,458 $56,350 $15,458
209,509
kWh
03 2.7135: Install occupancy sensors $3,260 $4,050 $3,260
44,189
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $45,254 $2,500 $45,254
613,200
kWh
05 2.7313: Recycle air for heating, ventilation and air conditioning $4,339 $8,740 $4,339
58,806
kWh
06 2.2622: Replace existing chiller with high efficiency model $339,042 $1,340,000 $339,042
4,595,315
kWh
TOTAL RECOMMENDED $413,588 $1,411,641 $413,588
5,605,530
kWh
TOTAL IMPLEMENTED $45,254 $2,500 $45,254
613,200
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs