Assessment Year | 2009 |
---|---|
Principal Product | Doors |
NAICS | 332321: Metal Window and Door Manufacturing |
SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
Sales Range | $10 M to 50M |
# of Employees | 280 |
Plant Area |
286,500
ft2
|
Annual Production | 300,000
pieces
|
Production Hrs. Annual | 3,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $129,698 | 2,754,840 |
kWh
|
$0.047 |
Electricity Demand | $91,271 | 9,720 |
kW-mo/yr
|
$9.39 |
Electricity Fees | $26,035 | - |
|
- |
Natural Gas | $26,541 | 1,618 |
MMBtu
|
$16.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $73,162 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,281 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.8112: Combine utility meters | $26,664 | $9,750 | - | - | $26,664 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,311 | $800 |
$729
15,489
kWh
|
$582
-
kW-mo/yr
|
- | |
03 | 2.4314: Use synthetic lubricant | $1,648 | - |
$882
18,734
kWh
|
$766
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,625 | $7,142 |
$904
19,200
kWh
|
$721
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,542 | $33,330 |
$4,195
89,100
kWh
|
$3,347
-
kW-mo/yr
|
- | |
06 | 2.4133: Use most efficient type of electric motors | $1,697 | $2,084 |
$944
20,059
kWh
|
$753
-
kW-mo/yr
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $32,675 | $122,352 |
$22,381
475,381
kWh
|
$10,294
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $73,162 | $175,458 |
$30,035
637,963
kWh
|
$16,463
-
kW-mo/yr
|
$26,664 | ||
TOTAL IMPLEMENTED | $6,281 | $10,026 |
$3,459
73,482
kWh
|
$2,822
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs