ITAC Assessment: GT0866
ITAC logo
ITAC Assessment: GT0866
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Doors
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area 286,500
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,698 2,754,840
kWh
Electricity Demand $91,271 9,720
kW-mo/yr
Electricity Fees $26,035 -
Natural Gas $26,541 1,618
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,162 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,281

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.8112: Combine utility meters $26,664 $9,750 - - $26,664
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,311 $800 $729
15,489
kWh
$582
-
kW-mo/yr
-
03 2.4314: Use synthetic lubricant $1,648 - $882
18,734
kWh
$766
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,625 $7,142 $904
19,200
kWh
$721
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $7,542 $33,330 $4,195
89,100
kWh
$3,347
-
kW-mo/yr
-
06 2.4133: Use most efficient type of electric motors $1,697 $2,084 $944
20,059
kWh
$753
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $32,675 $122,352 $22,381
475,381
kWh
$10,294
-
kW-mo/yr
-
TOTAL RECOMMENDED $73,162 $175,458 $30,035
637,963
kWh
$16,463
-
kW-mo/yr
$26,664
TOTAL IMPLEMENTED $6,281 $10,026 $3,459
73,482
kWh
$2,822
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs