Assessment Year | 2008 |
---|---|
Principal Product | Gear Pumps |
NAICS | 333911: Pump and Pumping Equipment Manufacturing |
SIC | 3561: Pumps and Pumping Equipment |
Sales Range | $10 M to 50M |
# of Employees | 215 |
Plant Area |
156,040
ft2
|
Annual Production | 32,400
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $375,113 | 7,964,179 |
kWh
|
$0.047 |
Electricity Demand | $213,636 | 17,132 |
kW-mo/yr
|
$12.47 |
Electricity Fees | $47,190 | - |
|
- |
Natural Gas | $131,134 | 9,180 |
MMBtu
|
$14.28 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $127,768 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $54,768 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $24,327 | $3,500 |
$17,892
380,680
kWh
|
$6,435
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,774 | - |
$3,502
74,500
kWh
|
$1,272
-
kW-mo/yr
|
- | |
03 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $9,073 | $9,000 | - | - |
$9,073
-
MMBtu
|
|
04 | 2.2437: Recover waste heat from equipment | $790 | $2,775 | - | - |
$790
-
MMBtu
|
|
05 | 2.7241: Install outside air damper / economizer on hvac unit | $9,500 | $15,600 |
$9,500
202,167
kWh
|
- | - | |
06 | 2.2314: Replace heat treating oven with more efficient unit | $22,600 | $60,000 | - | - |
$22,600
-
MMBtu
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $25,667 | $37,500 |
$20,639
438,190
kWh
|
$5,028
-
kW-mo/yr
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $31,037 | $64,132 |
$20,578
437,835
kWh
|
$10,459
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $127,768 | $192,507 |
$72,111
1,533,372
kWh
|
$23,194
-
kW-mo/yr
|
$32,463
-
MMBtu
|
||
TOTAL IMPLEMENTED | $54,768 | $41,000 |
$42,033
893,370
kWh
|
$12,735
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs