ITAC Assessment: GT0852
ITAC logo
ITAC Assessment: GT0852
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Gear Pumps
NAICS 333911: Pump and Pumping Equipment Manufacturing
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 215
Plant Area 156,040
ft2
Annual Production 32,400
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $375,113 7,964,179
kWh
Electricity Demand $213,636 17,132
kW-mo/yr
Electricity Fees $47,190 -
Natural Gas $131,134 9,180
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $127,768 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,768

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $24,327 $3,500 $17,892
380,680
kWh
$6,435
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,774 - $3,502
74,500
kWh
$1,272
-
kW-mo/yr
-
03 2.2449: Recover heat from exhausted steam, hot air or hot water $9,073 $9,000 - - $9,073
-
MMBtu
04 2.2437: Recover waste heat from equipment $790 $2,775 - - $790
-
MMBtu
05 2.7241: Install outside air damper / economizer on hvac unit $9,500 $15,600 $9,500
202,167
kWh
- -
06 2.2314: Replace heat treating oven with more efficient unit $22,600 $60,000 - - $22,600
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $25,667 $37,500 $20,639
438,190
kWh
$5,028
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $31,037 $64,132 $20,578
437,835
kWh
$10,459
-
kW-mo/yr
-
TOTAL RECOMMENDED $127,768 $192,507 $72,111
1,533,372
kWh
$23,194
-
kW-mo/yr
$32,463
-
MMBtu
TOTAL IMPLEMENTED $54,768 $41,000 $42,033
893,370
kWh
$12,735
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs