Assessment Year | 2008 |
---|---|
Principal Product | Smoked Sausages and Meat |
NAICS | 311613: Rendering and Meat Byproduct Processing |
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $10 M to 50M |
# of Employees | 133 |
Plant Area |
60,000
ft2
|
Annual Production | 10,962,000
units
|
Production Hrs. Annual | 3,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $170,047 | 3,806,018 |
kWh
|
$0.045 |
Electricity Demand | $50,301 | 6,664 |
kW-mo/yr
|
$7.55 |
Natural Gas | $146,635 | 12,917 |
MMBtu
|
$11.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $168,160 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2121: Increase amount of condensate returned | $48,953 | $8,350 | - | - |
$48,953
-
MMBtu
|
- | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $12,800 | - |
$12,800
251,082
kWh
|
- | - | - | - | |
03 | 2.2694: Use highest temperature for chilling or cold storage | $15,410 | - |
$15,410
302,220
kWh
|
- | - | - | - | |
04 | 2.1231: Establish burner maintenance schedule for boilers | $18,784 | $450 | - | - |
$18,784
-
MMBtu
|
- | - | |
05 | 2.2135: Repair and eliminate steam leaks | $13,289 | $2,260 |
$2,450
48,000
kWh
|
- |
$10,839
-
MMBtu
|
- | - | |
06 | 2.2136: Install / repair insulation on steam lines | $2,838 | $1,832 | - | - |
$2,838
-
MMBtu
|
- | - | |
07 | 3.4151: Minimize water usage | $20,751 | $3,000 | - | - |
$18,251
-
MMBtu
|
$2,500
-
Tgal
|
- | |
08 | 2.2191: Substitute hot process fluids for steam | $10,080 | $32,550 | - | - |
$8,728
-
MMBtu
|
$676
-
Tgal
|
$676 | |
09 | 2.2437: Recover waste heat from equipment | $12,485 | $24,000 | - | - |
$12,485
-
MMBtu
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,770 | $5,110 |
$11,437
127,890
kWh
|
$1,333
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $168,160 | $77,552 |
$42,097
729,192
kWh
|
$1,333
-
kW-mo/yr
|
$120,878
-
MMBtu
|
$3,176
-
Tgal
|
$676 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs