ITAC Assessment: GT0840
ITAC logo
ITAC Assessment: GT0840
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Cellulose Insulation
NAICS 322299: All Other Converted Paper Product Manufacturing
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 24
Plant Area 61,600
ft2
Annual Production 69,000,000
lb
Production Hrs. Annual 4,450
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,469 3,888,000
kWh
Electricity Demand $6,358 11,894
kW-mo/yr
Natural Gas $1,276 91
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,837 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,835

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,598 $30,000 $1,932
55,041
kWh
$6,666
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,574 - $1,130
32,187
kWh
$444
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $4,377 $14,862 $3,120
88,864
kWh
$1,257
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $515 $2,301 $369
10,502
kWh
$146
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,943 $3,750 $2,110
60,120
kWh
$833
-
kW-mo/yr
-
06 2.2437: Recover waste heat from equipment $830 $2,500 $(-218.0)
(-6,216)
kWh
$(-228.0)
-
kW-mo/yr
$1,276
-
MMBtu
TOTAL RECOMMENDED $18,837 $53,413 $8,443
240,498
kWh
$9,118
-
kW-mo/yr
$1,276
-
MMBtu
TOTAL IMPLEMENTED $7,835 $20,913 $5,599
159,486
kWh
$2,236
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs