ITAC Assessment: GT0838
ITAC logo
ITAC Assessment: GT0838
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Rubber Backed Floor Mats
NAICS 314110: Carpet and Rug Mills
SIC 2273: Carpets and Rugs
Sales Range $50
M
to 100
M
# of Employees 240
Plant Area 190,000
ft2
Annual Production 41,400
thousand feet
Production Hrs. Annual 6,864
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,306 2,865,872
kWh
Electricity Demand $109,609 6,172
kW-mo/yr
Natural Gas $473,220 53,676
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $114,705 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $25,825 $10,000 $13,685
391,008
kWh
$12,140
-
kW-mo/yr
- - -
02 2.2212: Use minimum safe oven ventilation $5,955 $6,000 $178
5,088
kWh
$141
-
kW-mo/yr
$5,636
-
MMBtu
- -
03 2.6218: Turn off equipment when not in use $7,976 - - - $7,976
-
MMBtu
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $3,908 - - - $4,808
-
MMBtu
- $(-900.0)
05 2.2163: Use minimum steam operating pressure $17,020 - - - $17,020
-
MMBtu
- -
06 2.1241: Reduce excessive boiler blowdown $1,288 $3,975 - - $1,050
-
MMBtu
$238
-
Tgal
-
07 2.7224: Reduce space conditioning during non-working hours $2,338 $2,250 $2,338
66,792
kWh
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $39,896 $127,725 $21,141
604,032
kWh
$18,755
-
kW-mo/yr
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $8,159 $17,436 $4,323
123,552
kWh
$3,836
-
kW-mo/yr
- - -
10 2.2511: Insulate bare equipment $2,340 $2,004 - - $2,340
-
MMBtu
- -
TOTAL RECOMMENDED $114,705 $169,390 $41,665
1,190,472
kWh
$34,872
-
kW-mo/yr
$38,830
-
MMBtu
$238
-
Tgal
$(-900.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs