ITAC Assessment: GT0831
ITAC logo
ITAC Assessment: GT0831
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Plastic Packaging
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 130,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $592,129 23,404,319
kWh
Electricity Demand $538,502 45,869
kW-mo/yr
Electricity Fees $95,190 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,335 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Consumption Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,755 - $2,779
109,839
kWh
$1,976
-
kW-mo/yr
-
02 2.4314: Use synthetic lubricant $3,017 - $1,767
69,826
kWh
$1,250
-
kW-mo/yr
-
03 2.7124: Make a practice of turning off lights when not needed $2,388 $250 $1,460
57,692
kWh
$928
-
kW-mo/yr
-
04 3.4151: Minimize water usage $17,245 $1,500 - - $17,245
-
Tgal
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,441 $7,500 $10,762
425,388
kWh
$7,679
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,679 $3,100 $2,152
85,064
kWh
$1,527
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $11,785 $14,000 $8,774
346,801
kWh
$3,011
-
kW-mo/yr
-
08 2.4226: Use / purchase optimum sized compressor $7,077 - $2,103
83,117
kWh
$4,974
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $5,948 $3,898 $2,494
98,578
kWh
$3,454
-
kW-mo/yr
-
TOTAL RECOMMENDED $74,335 $30,248 $32,291
1,276,305
kWh
$24,799
-
kW-mo/yr
$17,245
-
Tgal
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs