| Assessment Year | 2005 |
|---|---|
| Principal Product | Tire Cord |
| NAICS | 314994: Rope, Cordage, Twine, Tire Cord, and Tire Fabric Mills |
| SIC | 2296: Tire Cord and Fabrics |
| Sales Range | $10 M to 50M |
| # of Employees | 172 |
| Plant Area |
1,400,000
ft2
|
| Annual Production | 10,700,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,241,254 | 18,707,376 |
kWh
|
$0.066 |
| Natural Gas | $581,508 | 92,771 |
MMBtu
|
$6.27 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $414,992 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $39,400 | $50,000 | - | - | - |
$39,400
-
MMBtu
|
- | |
| 02 | 2.1114: Limit and control secondary combustion air in furnace | $235,000 | $20,000 | - | - | - |
$235,000
-
MMBtu
|
- | |
| 03 | 2.8114: Change rate schedules or other changes in utility service | $85,200 | $10,000 | - | - | $85,200 | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,500 | $82,400 |
$21,500
526,000
kWh
|
- | - | - | - | |
| 05 | 2.7122: Disconnect ballasts | $18,200 | $15,200 |
$12,600
288,000
kWh
|
$5,600
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,292 | $1,190 |
$358
8,760
kWh
|
- | - | - | $934 | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $10,600 | $19,900 |
$10,600
259,000
kWh
|
- | - | - | - | |
| 08 | 2.4314: Use synthetic lubricant | $3,800 | - |
$3,800
92,800
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $414,992 | $198,690 |
$48,858
1,174,560
kWh
|
$5,600
-
kW-mo/yr
|
$85,200 |
$274,400
-
MMBtu
|
$934 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs