Assessment Year | 2005 |
---|---|
Principal Product | Tire Cord |
NAICS | 314994: Rope, Cordage, Twine, Tire Cord, and Tire Fabric Mills |
SIC | 2296: Tire Cord and Fabrics |
Sales Range | $10 M to 50M |
# of Employees | 172 |
Plant Area |
1,400,000
ft2
|
Annual Production | 10,700,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,241,254 | 18,707,376 |
kWh
|
$0.066 |
Natural Gas | $581,508 | 92,771 |
MMBtu
|
$6.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $414,992 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $39,400 | $50,000 | - | - | - |
$39,400
-
MMBtu
|
- | |
02 | 2.1114: Limit and control secondary combustion air in furnace | $235,000 | $20,000 | - | - | - |
$235,000
-
MMBtu
|
- | |
03 | 2.8114: Change rate schedules or other changes in utility service | $85,200 | $10,000 | - | - | $85,200 | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,500 | $82,400 |
$21,500
526,000
kWh
|
- | - | - | - | |
05 | 2.7122: Disconnect ballasts | $18,200 | $15,200 |
$12,600
288,000
kWh
|
$5,600
-
kW-mo/yr
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,292 | $1,190 |
$358
8,760
kWh
|
- | - | - | $934 | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $10,600 | $19,900 |
$10,600
259,000
kWh
|
- | - | - | - | |
08 | 2.4314: Use synthetic lubricant | $3,800 | - |
$3,800
92,800
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $414,992 | $198,690 |
$48,858
1,174,560
kWh
|
$5,600
-
kW-mo/yr
|
$85,200 |
$274,400
-
MMBtu
|
$934 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs