ITAC Assessment: GT0805
ITAC logo
ITAC Assessment: GT0805
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Fiberglass Bathtubs
NAICS 326191: Plastics Plumbing Fixture Manufacturing
SIC 3088: Plastics Plumbing Fixtures
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 109,065
ft2
Annual Production 32,700
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,975 861,120
kWh
Electricity Demand $40,267 49,109
kW-mo/yr
Electricity Fees $6,195 -
Natural Gas $106,034 11,937
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $119,330 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $310 $253 $67
2,190
kWh
$39
-
kW-mo/yr
- - - $204
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,451 $3,470 $425
13,800
kWh
$1,026
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,375 $5,705 $649
21,076
kWh
$1,726
-
kW-mo/yr
- - - -
04 2.7122: Disconnect ballasts $1,400 $700 $410
13,321
kWh
$990
-
kW-mo/yr
- - - -
05 2.8112: Combine utility meters $4,682 $7,000 - - - - $4,682 -
06 2.8114: Change rate schedules or other changes in utility service $23,800 - - - - $23,800 - -
07 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $11,117 $10,000 $3,265
106,000
kWh
$7,852
-
kW-mo/yr
- - - -
08 2.5194: Redesign process $74,195 $46,000 $(-2,464.0)
(-80,000)
kWh
$(-15,456.0)
-
kW-mo/yr
$92,115
-
MMBtu
- - -
TOTAL RECOMMENDED $119,330 $73,128 $2,352
76,387
kWh
$(-3,823.0)
-
kW-mo/yr
$92,115
-
MMBtu
$23,800 $4,682 $204
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs