ITAC Assessment: GT0803
ITAC logo
ITAC Assessment: GT0803
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Laminated Shingles
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $50
M
to 100
M
# of Employees 112
Plant Area 150,000
ft2
Annual Production 2,360,000
pieces
Production Hrs. Annual 8,424
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $310,932 8,601,615
kWh
Electricity Demand $36,050 13,364
kW-mo/yr
Electricity Fees $28,540 -
Natural Gas $375,327 54,970
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $92,581 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,490

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,764 $944 $1,669
40,500
kWh
$95
-
kW-mo/yr
- -
02 2.1133: Adjust burners for efficient operation $11,058 $1,000 - - $11,058
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,504 $7,500 $15,618
379,080
kWh
$886
-
kW-mo/yr
- -
04 2.1133: Adjust burners for efficient operation $26,869 $3,000 - - $26,869
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,965 $13,380 $4,699
114,061
kWh
$266
-
kW-mo/yr
- -
06 2.7111: Reduce illumination to minimum necessary levels $10,157 $27,000 $9,612
233,300
kWh
$545
-
kW-mo/yr
- -
07 2.7134: Use photocell controls $2,516 $570 $2,516
61,080
kWh
- - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $779 $695 $733
17,795
kWh
$46
-
kW-mo/yr
- -
09 2.3212: Optimize plant power factor $17,969 $6,055 - - - $17,969
TOTAL RECOMMENDED $92,581 $60,144 $34,847
845,816
kWh
$1,838
-
kW-mo/yr
$37,927
-
MMBtu
$17,969
TOTAL IMPLEMENTED $59,490 $13,709 $20,536
498,455
kWh
$1,027
-
kW-mo/yr
$37,927
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs