Assessment Year | 2004 |
---|---|
Principal Product | FLEXIBLE PACKAGING ROLL STOCK |
NAICS | 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing |
SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
70,000
ft2
|
Annual Production | 13,000,000
lb
|
Production Hrs. Annual | 6,336
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $232,792 | 3,731,365 |
kWh
|
$0.062 |
Natural Gas | $53,577 | 6,808 |
MMBtu
|
$7.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,725 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,055 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2628: Utilize a less expensive cooling method | $7,120 | $5,800 |
$7,120
244,123
kWh
|
- | |
02 | 2.1331: Burn a less expensive grade of fuel | $9,340 | $2,000 |
$(-521.0)
(-17,844)
kWh
|
$9,861
-
MMBtu
|
|
03 | 2.1321: Replace fossil fuel equipment with electrical equipment | $7,210 | $3,000 |
$(-31,942.0)
(-1,093,493)
kWh
|
$39,152
-
MMBtu
|
|
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,280 | $2,145 |
$1,280
43,864
kWh
|
- | |
05 | 2.7224: Reduce space conditioning during non-working hours | $2,625 | $200 |
$1,625
55,478
kWh
|
$1,000
-
MMBtu
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $540 | $450 |
$540
18,344
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $610 | $2,340 |
$610
20,985
kWh
|
- | |
TOTAL RECOMMENDED | $28,725 | $15,935 |
$(-21,288.0)
(-728,543)
kWh
|
$50,013
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,055 | $5,135 |
$4,055
138,671
kWh
|
$1,000
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs