ITAC Assessment: AM0554
ITAC logo
ITAC Assessment: AM0554
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Steel forgings
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $100
M
to 500
M
# of Employees 340
Plant Area 400,000
ft2
Annual Production 140,000,000
lb
Production Hrs. Annual 5,872
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,831,298 578,359,525
kWh
Electricity Demand $524,056 182,958
kW-mo/yr
Electricity Fees $3,600 -
Natural Gas $495,448 61,931
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $497,237 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $416,257

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $213,800 $45,770 $206,300
1,753,000
kWh
$7,500
-
kW-mo/yr
- -
02 2.6218: Turn off equipment when not in use $133,000 $1,000 $133,000
1,130,000
kWh
- - -
03 2.6218: Turn off equipment when not in use $77,830 - $77,830
661,300
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $51,670 $2,000 $50,000
425,000
kWh
$1,670
-
kW-mo/yr
- -
05 2.8123: Pay utility bills on time $9,462 - - - $9,462 -
06 2.4133: Use most efficient type of electric motors $4,900 $5,400 $4,670
39,730
kWh
$230
-
kW-mo/yr
- -
07 2.4314: Use synthetic lubricant $3,150 - $3,000
25,480
kWh
$150
-
kW-mo/yr
- -
08 2.7124: Make a practice of turning off lights when not needed $2,185 $500 $2,025
17,200
kWh
$160
-
kW-mo/yr
- -
09 3.5113: Sell oil to recycler $1,240 - - - - $1,240
TOTAL RECOMMENDED $497,237 $54,670 $476,825
4,051,710
kWh
$9,710
-
kW-mo/yr
$9,462 $1,240
TOTAL IMPLEMENTED $416,257 $54,670 $395,995
3,364,930
kWh
$9,560
-
kW-mo/yr
$9,462 $1,240
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs