ITAC Assessment: AM0371
ITAC logo
ITAC Assessment: AM0371
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Split steel
NAICS
n/a
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range $100
M
to 500
M
# of Employees 193
Plant Area 225,000
ft2
Annual Production 333,000,000
lb
Production Hrs. Annual 7,272
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,584 3,859,906
kWh
Electricity Demand $31,806 10,380
kW-mo/yr
Natural Gas $29,581 5,061
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $375,277 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $78,692

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $295,000 $1,000 - - - - $295,000 -
02 3.5316: Contract a wood pallet recycling company $30,530 - - - - $30,530
-
lb
- -
03 2.3212: Optimize plant power factor $30,200 $23,700 - $30,200
-
kW-mo/yr
- - - -
04 2.8114: Change rate schedules or other changes in utility service $8,650 - - - $8,650 - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,060 $1,500 $4,060
161,196
kWh
- - - - -
06 2.4133: Use most efficient type of electric motors $4,730 $12,770 $1,730
69,168
kWh
$3,000
-
kW-mo/yr
- - - -
07 3.2176: Increase use of automation $950 $150 - - - $950
-
lb
- -
08 2.4314: Use synthetic lubricant $635 - $315
12,603
kWh
$320
-
kW-mo/yr
- - - -
09 4.821: Pay bills on time to avoid late fees $522 - - - - - - $522
TOTAL RECOMMENDED $375,277 $39,120 $6,105
242,967
kWh
$33,520
-
kW-mo/yr
$8,650 $31,480
-
lb
$295,000 $522
TOTAL IMPLEMENTED $78,692 $37,970 $5,790
230,364
kWh
$33,200
-
kW-mo/yr
$8,650 $30,530
-
lb
- $522
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs