ITAC Assessment: GT0772
ITAC logo
ITAC Assessment: GT0772
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product SOFT DRINKS
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range n/a
# of Employees 263
Plant Area 300,000
ft2
Annual Production 44,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $377,752 16,344,387
kWh
Electricity Demand $458,867 35,442
kW-mo/yr
Natural Gas $278,228 44,393
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $143,273 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,388

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,490 $6,340 $4,320
186,950
kWh
$3,170
-
kW-mo/yr
- - -
02 2.2511: Insulate bare equipment $354 $248 - - - $354
-
MMBtu
-
03 2.6218: Turn off equipment when not in use $5,848 - $3,372
145,891
kWh
$2,476
-
kW-mo/yr
- - -
04 2.8112: Combine utility meters $113,960 - - - $113,960 - -
05 3.4115: Recover and reuse cooling water $13,569 $12,000 n/a $(-13,395.0)
(-218,429)
kWh
- - - $26,964
-
Tgal
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,050 $300 $605
26,166
kWh
$445
-
kW-mo/yr
- - -
07 2.7135: Install occupancy sensors $130 $50 $130
3,762
kWh
- - - -
08 2.9113: Use solar heat for heat $872 $490 $872
37,720
kWh
- - - -
TOTAL RECOMMENDED $143,273 $19,428 $(-4,096.0)
182,060
kWh
$6,091
-
kW-mo/yr
$113,960 $354
-
MMBtu
$26,964
-
Tgal
TOTAL IMPLEMENTED $14,388 $6,640 $8,297
359,007
kWh
$6,091
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs