ITAC Assessment: GT0766
ITAC logo
ITAC Assessment: GT0766
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product WOVEN CLOTH
NAICS 313210: Broadwoven Fabric Mills
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 500,000
ft2
Annual Production 225,000,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,565,989 60,153,000
kWh
Natural Gas $2,743,914 567,498
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $267,573 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,617

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $770 $500 $770
23,754
kWh
-
02 2.7124: Make a practice of turning off lights when not needed $30,090 $6,864 $30,090
581,244
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $32,869 $500 - $32,869
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,159 $6,250 $11,159
324,942
kWh
-
05 2.2135: Repair and eliminate steam leaks $5,000 $1,000 - $5,000
-
MMBtu
06 2.2511: Insulate bare equipment $3,238 $386 - $3,238
-
MMBtu
07 2.2449: Recover heat from exhausted steam, hot air or hot water $108,981 $44,500 - $108,981
-
MMBtu
08 2.4133: Use most efficient type of electric motors $4,589 $49,906 $4,589
141,633
kWh
-
09 2.4322: Use or replace with energy efficient substitutes $70,877 $80,650 - $70,877
-
MMBtu
TOTAL RECOMMENDED $267,573 $190,556 $46,608
1,071,573
kWh
$220,965
-
MMBtu
TOTAL IMPLEMENTED $53,617 $57,656 $15,748
466,575
kWh
$37,869
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs