ITAC Assessment: GT0764
ITAC logo
ITAC Assessment: GT0764
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product LAWNMOWER BLADES
NAICS 333112: Lawn and Garden Tractor and Home Lawn and Garden Equipment Manufacturing
SIC 3524: Lawn and Garden Tractors and Home Lawn and Garden Equipment
Sales Range $5
M
to 10
M
# of Employees 125
Plant Area 90,000
ft2
Annual Production 8,000,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $235,756 8,515,332
kWh
Electricity Demand $213,061 18,291
kW-mo/yr
Natural Gas $93,844 14,063
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,193 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,088

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2514: Cover open tanks $17,200 - $13,050
680,400
kWh
$4,150
-
kW-mo/yr
-
02 2.4314: Use synthetic lubricant $1,055 - $400
13,700
kWh
$655
-
kW-mo/yr
-
03 2.2514: Cover open tanks $7,550 $2,505 $1,190
40,470
kWh
$660
-
kW-mo/yr
$5,700
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $620 $1,555 $270
9,137
kWh
$350
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,750 $710 $3,750
127,400
kWh
- -
06 2.1221: Replace obsolete burners with more efficient ones $17,500 $38,000 $8,225
279,500
kWh
$4,425
-
kW-mo/yr
$4,850
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,150 $5,635 $200
6,670
kWh
$950
-
kW-mo/yr
-
08 2.4133: Use most efficient type of electric motors $2,368 $36,246 $850
28,896
kWh
$1,518
-
kW-mo/yr
-
TOTAL RECOMMENDED $51,193 $84,651 $27,935
1,186,173
kWh
$12,708
-
kW-mo/yr
$10,550
-
MMBtu
TOTAL IMPLEMENTED $25,088 $44,146 $18,120
852,503
kWh
$6,968
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs