ITAC Assessment: GT0753
ITAC logo
ITAC Assessment: GT0753
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product LUMBER
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 308,500
ft2
Annual Production 100,000
thousand feet
Production Hrs. Annual 2,340
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $546,227 11,472,048
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,962 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,192

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $3,610 $5,000 $3,610
93,996
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,800 $2,500 $3,800
187,992
kWh
03 2.4133: Use most efficient type of electric motors $17,682 $93,028 $17,682
526,292
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,360 $4,120 $4,360
129,902
kWh
05 2.7134: Use photocell controls $1,420 $1,000 $1,420
38,640
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,740 $9,690 $2,740
81,522
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,350 $6,700 $2,350
69,983
kWh
TOTAL RECOMMENDED $35,962 $122,038 $35,962
1,128,327
kWh
TOTAL IMPLEMENTED $32,192 $114,338 $32,192
1,019,704
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs