Assessment Year | 2003 |
---|---|
Principal Product | CARBONATED DRINKS |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $100 M to 500M |
# of Employees | 302 |
Plant Area |
404,211
ft2
|
Annual Production | 49,484
ton
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $594,704 | 12,579,650 |
kWh
|
$0.047 |
Natural Gas | $452,000 | 106,251 |
MMBtu
|
$4.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $80,661 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,743 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1231: Establish burner maintenance schedule for boilers | $5,393 | $1,350 | - | - |
$5,393
-
MMBtu
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $226 | $400 |
$214
7,571
kWh
|
$12 | - | - | |
03 | 2.1111: Control pressure on steamer operations | $1,680 | - | - | - |
$1,680
-
MMBtu
|
- | |
04 | 2.4314: Use synthetic lubricant | $6,298 | - |
$5,942
210,700
kWh
|
$356 | - | - | |
05 | 2.2136: Install / repair insulation on steam lines | $1,058 | $372 | - | - |
$1,058
-
MMBtu
|
- | |
06 | 2.2121: Increase amount of condensate returned | $17,688 | $5,200 | - | - |
$17,200
-
MMBtu
|
$488
-
Tgal
|
|
07 | 2.4322: Use or replace with energy efficient substitutes | $35,980 | $15,000 | - | - |
$35,980
-
MMBtu
|
- | |
08 | 2.2621: Modify refrigeration system to operate at a lower pressure | $9,570 | $27,000 |
$9,570
301,090
kWh
|
- | - | - | |
09 | 2.4322: Use or replace with energy efficient substitutes | $2,768 | $14,000 |
$2,612
92,611
kWh
|
$156 | - | - | |
TOTAL RECOMMENDED | $80,661 | $63,322 |
$18,338
611,972
kWh
|
$524 |
$61,311
-
MMBtu
|
$488
-
Tgal
|
||
TOTAL IMPLEMENTED | $15,743 | $16,122 |
$8,768
310,882
kWh
|
$524 |
$6,451
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs