ITAC Assessment: GT0747
ITAC logo
ITAC Assessment: GT0747
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product MOLDED PARTS
NAICS 327110: Pottery, Ceramics, and Plumbing Fixture Manufacturing
SIC 3261: Vitreous China Plumbing Fixtures and China and Earthenware Fittings and Bathroom Accessories
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area 9,600,000
ft2
Annual Production 519,000,000
pieces
Production Hrs. Annual 8,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $344,926 5,522,156
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $108,182 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,279

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4322: Use or replace with energy efficient substitutes $267 $100 $147
6,520
kWh
$102
-
kW-mo/yr
$18
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $43,776 $270,000 $22,464
993,454
kWh
$18,448
-
kW-mo/yr
$2,864
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $252 $350 $139
6,141
kWh
$97
-
kW-mo/yr
$16
04 2.4239: Eliminate or reduce compressed air usage $1,740 - $1,020
45,100
kWh
$720
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $47,676 $9,250 $1,033
36,700
kWh
$45,700
-
kW-mo/yr
$943
06 2.4133: Use most efficient type of electric motors $6,358 $41,789 $2,593
114,746
kWh
$3,409
-
kW-mo/yr
$356
07 2.2614: Use cooling tower or economizer to replace chiller cooling $7,662 $1,500 $4,217
186,588
kWh
$2,944
-
kW-mo/yr
$501
08 2.7142: Utilize higher efficiency lamps and/or ballasts $451 $135 $171
7,565
kWh
$251
-
kW-mo/yr
$29
TOTAL RECOMMENDED $108,182 $323,124 $31,784
1,396,814
kWh
$71,671
-
kW-mo/yr
$4,727
TOTAL IMPLEMENTED $16,279 $43,739 $8,116
359,095
kWh
$7,272
-
kW-mo/yr
$891
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs