Assessment Year | 2002 |
---|---|
Principal Product | Textile Finishing |
NAICS |
n/a
|
SIC | 2269: Finishers of Textiles, Not elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
528,700
ft2
|
Annual Production | 13,500,000
lb
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $174,809 | 6,943,142 |
kWh
|
$0.025 |
Electricity Demand | $163,188 | 19,441 |
kW-mo/yr
|
$8.39 |
Natural Gas | $271,125 | 48,705 |
MMBtu
|
$5.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $103,406 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,040 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2163: Use minimum steam operating pressure | $1,259 | - | - | - |
$1,259
-
MMBtu
|
- | - | |
02 | 2.1212: Operate boilers on high fire setting | $5,598 | - | - | - |
$5,598
-
MMBtu
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $671 | - |
$671
39,566
kWh
|
- | - | - | - | |
04 | 3.4153: Use counter current rinsing to reduce waste water | $10,781 | $1,720 | - | - |
$7,276
-
MMBtu
|
- |
$3,505
-
Tgal
|
|
05 | 2.7233: Use properly designed and sized hvac equipment | $78,433 | $112,650 |
$16,651
979,484
kWh
|
$48,248
-
kW-mo/yr
|
- | $4,380 |
$9,154
-
Tgal
|
|
06 | 2.2437: Recover waste heat from equipment | $2,792 | $5,050 |
$(-77.0)
(-4,396)
kWh
|
- |
$2,869
-
MMBtu
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,206 | $17,240 |
$1,257
73,857
kWh
|
$949
-
kW-mo/yr
|
- | - | - | |
08 | 2.7111: Reduce illumination to minimum necessary levels | $1,666 | - |
$949
55,686
kWh
|
$717
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $103,406 | $136,660 |
$19,451
1,144,197
kWh
|
$49,914
-
kW-mo/yr
|
$17,002
-
MMBtu
|
$4,380 |
$12,659
-
Tgal
|
||
TOTAL IMPLEMENTED | $12,040 | $1,720 | - | - |
$8,535
-
MMBtu
|
- |
$3,505
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs