ITAC Assessment: GT0737
ITAC logo
ITAC Assessment: GT0737
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product mattresses, box springs
NAICS
n/a
SIC 2515: Mattresses, Foundations, and Convertible Beds
Sales Range $100
M
to 500
M
# of Employees 132
Plant Area 200,000
ft2
Annual Production 325,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,396 1,181,419
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,951 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,058

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $2,238 $5,018 - - $2,238 -
02 2.4231: Reduce the pressure of compressed air to the minimum required $193 $330 - - $193 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $170 - - - - $170
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $715 $2,240 $330
2,394,490
kWh
$280
-
kW-mo/yr
$105 -
05 3.1161: Eliminate/reduce an operation $530 $675 $230
1,668,230
kWh
$246
-
kW-mo/yr
$54 -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,105 $4,013 $401
2,908,265
kWh
$627
-
kW-mo/yr
$77 -
TOTAL RECOMMENDED $4,951 $12,276 $961
6,970,985
kWh
$1,153
-
kW-mo/yr
$2,667 $170
-
MMBtu
TOTAL IMPLEMENTED $4,058 $11,271 $731
5,302,755
kWh
$907
-
kW-mo/yr
$2,420 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs